Energy efficiency & rebate incentives
Rebate money belongs in the project, while it can still change the spec.
As a certified ICC energy efficiency measures installer, we identify incentives during the assessment rather than after the equipment is chosen.
Request a condition assessmentAs a certified energy efficiency measures installer through ICC, we can offer energy rebate incentives to our commercial customers.
Who this is for
Maintenance / facility manager
You are specifying a replacement
Which unit gets installed can change what the project is worth in incentives. That is a conversation to have before the order, not after the install.
Director of facilities
You are building the capital case
An incentive changes the net cost of a replacement and therefore its position in the priority list. Identified early, it can move work forward a budget cycle.
ICC certified installer
Certified energy efficiency measures installer through ICC, so the incentive route is open to commercial customers.
Rebates identified during the assessment
Incentives surface alongside the condition ratings, while the specification is still open.
Efficiency priced alongside replacement
Upgrade options costed next to like-for-like replacement, so the comparison is visible.
Performance the plan can track
Efficiency work recorded against the unit, so the effect is attached to the equipment rather than to a claim.
The statuses this page is about
Efficiency work follows the bottom three rows. Equipment declining in efficiency is where an upgrade has something to improve on, and where an incentive has the most to work with.
Equipment status board
Aging equipment
What it means
Approaching end of useful life. Efficiency declining.
Your risk
Rising
What we do
Begin replacement conversations. Budget planning recommended.
Major repair likely
What it means
Major components showing wear. Failures increasing.
Your risk
High
What we do
Provide repair vs. replacement options. Evaluate long-term cost impact.
Replacement candidate
What it means
Severe aging or major failure. Not cost-effective to repair.
Your risk
Critical
What we do
Prepare replacement proposal. Prioritize in replacement pipeline.
How it connects
02
Written capital plan
Condition ratings, remaining useful life, a failure forecast and replacement cost ranges.
You are here
01
Condition assessment
We walk every roof and mechanical room and inventory what is actually there.
03
Service agreement
Maintenance scoped to the equipment the plan says needs it.
04
Proactive replacements
Changeouts scheduled into your budget cycle instead of into an emergency.
Questions we get
What does ICC certification mean here?
We are a certified energy efficiency measures installer through ICC, which is what allows us to offer energy rebate incentives to commercial customers on qualifying work.
When should rebates be looked at?
During the assessment, while the specification is still open. Checking after the equipment is chosen usually means the option that qualified is no longer the option being installed.
Will an efficiency upgrade pay for itself?
That depends on the unit, its run hours and what incentive applies, so it is a question the assessment answers for your specific equipment rather than one with a general answer.
Is this separate from the capital plan?
No. Incentives change the net cost of a replacement, which changes where it sits in the priority list. It belongs in the plan rather than beside it.