‹ Resources
Outpatient healthcare clinic

A full boiler plant replacement in an occupied clinic.

Old standard-efficiency boilers out, one high-efficiency condensing boiler in, with structural, hydronic and controls work coordinated inside a building that stayed in use.

Download the one-page PDF
2,000,000
BTU high-efficiency condensing boiler
1 unit
Replaced the old plant, smaller footprint
BACnet
Integrated with the building automation system
Factory
Authorized startup and commissioning

The problem

An occupied healthcare clinic was heating on aging standard-efficiency boilers. The replacement had to fit the existing mechanical room, meet code for exhaust and condensate discharge, protect new equipment from debris in an old hydronic loop, and report into the building automation system.

The solution

We removed the old boilers, cored the foundation wall and routed new exhaust to about 9 feet above grade, and combined the existing supply and return loops onto one 2,000,000 BTU high-efficiency condensing boiler. We flushed the hydronic system, added a magnetic filter and condensate neutralizer, installed a BACnet card for BAS integration, and closed out with factory-authorized startup and commissioning.

Equipment installed
ItemDetail
New boiler One 2,000,000 BTU high-efficiency condensing boiler
Design features Redundant heat engines; reduced boiler plant footprint
Equipment protection Inline magnetic filter; condensate acid neutralizer
Controls BACnet communication card for BAS integration
Warranty 1-year factory labor warranty
New high-efficiency condensing boiler installed in a mechanical room, with hydronic piping, a magnetic filter and condensate neutralizer connected
The new condensing boiler and hydronic tie-in.

Scope of work

  • Removed and disposed of the existing boilers
  • Cored the foundation wall for new exhaust
  • Exhaust terminated ~9 ft above grade with bird screen
  • Combined supply and return loops for the new boiler
  • Flushed the existing hydronic system
  • Sealed all new exterior wall penetrations

Boiler plant reaching the end of its life?

Email sales@rabinemechanical.com or call 815.331.1035. Our own crews cover northern Illinois and southern Wisconsin; qualified service partners cover all other markets.

All resources ›

You can either plan your HVAC costs, or your HVAC system will plan them for you.

Request service or a quote